Dogs and Horses
D&H Rolled Soft Leather Adjustable Long Lead Grey
D&H Rolled Soft Leather Adjustable Long Lead Grey
Couldn't load pickup availability
Share

Collapsible content
WHY THIS LEAD
- Adjustable lengths up to 180cm+ (6-feet+)
- Hands-free when you secure over your shoulder
- Multi-purpose / double-ended (a hook at each end)
- Versatility securing your dog to a park bench or table at the pub
- Internal rope cord is extra strong and will not rot if it gets wet
- Colour-fast fine European leather battle-tested against the elements*
- Fabulous range of colours to choose from
- Goodwill stitching guarantee**
*do not allow leather to come into contact with liquid chemical flea treatments
**refer to the goodwill stitching guarantee page for more information (link in footer menu)
Sizing
Measures approx 225cm (7ft+) end to end. It can be configured to varying lengths.
The 'standard' size is approx 10mm thick plus the stitched seam. We also provide a finer version for smaller dogs (size Small) with proportionally smaller hooks. The size Large is thicker with heavier hooks for big dogs.
Materials
- Made of soft European leather battle-tested against the elements.
- Colour-fast (will not leech dye onto your dog's coat)*
- Internal polyester cord is load-bearing into the hundreds of kilograms.
- Solid brass or nickel-plated (silver) solid load-bearing fittings to ensure strength of the lead and security of your dog.
*do not allow the leather to come into contact with chemicals from liquid flea treatments
Care Instructions
A cleaning with dubbin or saddle soap, then buffed with a leather restorative like Neat's Foot Oil or a beeswax product (e.g. Renapur or Leather Genie) will help restore the leather to its natural lustre and protect it against the elements.
Leather and Water. To help ensure the longevity of your dog's leather collar, allow to air-dry (not on a radiator) after it gets wet and ensure it is dry before re-using. Treat with a leather restorative, as above. Although we seal the edges, water can still infiltrate the leather and cause it to deteriorate (cleaning with a damp cloth and a mild non-abrasive cleaner is also fine though always advisable to test to ensure colour does not lift).
Regular Inspection. We encourage regular hands-on inspection and cleaning of your items to ensure against wear and tear as well as the comfort and security of your dog.
Do not allow the leather to come into contact with the chemicals from commercially-available flea spot-on treatments. This will damage the leather and may cause the dye to run (this applies to all leather - including car seats or leather upholstered furniture).