Skip to product information
1 of 1

Dogs & Horses Europe

Rolled Soft Leather Long Lead - 165cm | Grey

Rolled Soft Leather Long Lead - 165cm | Grey

Regular price €90,00 EUR
Regular price Sale price €90,00 EUR
Sale Sold out
Taxes included. Shipping calculated at checkout.
Metal Fittings
Dog Size
Quantity
View full details

Collapsible content

WHY THIS LEAD

  • at approx 165cm end-to-end, it is longer than our standard rolled lead
  • features a hook at each end
  • create a handle with the top hook
  • convenient securing your dog eg at park bench, to a post or in the cafe/pub
  • Strong, pliable and comfortable to hold and handle
  • Pair with any dog collar
  • Fabulous range of colours to choose from
  • Handmade by us
  • Goodwill stitching guarantee*

*refer to the goodwill stitching guarantee page for more information (link in footer menu)

Sizing

The Rolled Soft Leather Lead is approximately 165cm long, including the handle and end-hook (clip).

Standard (Medium) approx 1cm thick plus the stitched seam with standard size hook/clip.

Small is a finer version, approx 8mm thick plus the stitched seam, with proportionally smaller hook/clip.

Large approx 12mm thick plus the stitched seam with heavier duty hook/clip.

Materials

Made of soft European leather battle-tested against the elements.

Colour-fast (will not leech dye onto your dog's coat)*

Solid brass or nickel-plated (silver) solid load-bearing fittings to ensure strength of the lead and security of your dog.

*do not allow the leather to come into contact with chemicals from liquid flea treatments

Care Instructions