Dogs & Horses Europe
Rolled Soft Leather Long Lead - 165cm | Purple
Rolled Soft Leather Long Lead - 165cm | Purple
Couldn't load pickup availability
Share

Collapsible content
WHY THIS LEAD
- at approx 165cm end-to-end, it is longer than our standard rolled lead
- features a hook at each end
- create a handle with the top hook
- convenient securing your dog eg at park bench, to a post or in the cafe/pub
- Strong, pliable and comfortable to hold and handle
- Pair with any dog collar
- Fabulous range of colours to choose from
- Handmade by us
- Goodwill stitching guarantee*
*refer to the goodwill stitching guarantee page for more information (link in footer menu)
Sizing
The Rolled Soft Leather Lead is approximately 165cm long, including the handle and end-hook (clip).
Standard (Medium) approx 1cm thick plus the stitched seam with standard size hook/clip.
Small is a finer version, approx 8mm thick plus the stitched seam, with proportionally smaller hook/clip.
Large approx 12mm thick plus the stitched seam with heavier duty hook/clip.
Materials
Made of soft European leather battle-tested against the elements.
Colour-fast (will not leech dye onto your dog's coat)*
Solid brass or nickel-plated (silver) solid load-bearing fittings to ensure strength of the lead and security of your dog.
*do not allow the leather to come into contact with chemicals from liquid flea treatments